Skip to content

Knowledge

Data-centre decommissioning in Austria: documentation and compliance

Vienna, Graz, Linz. The job rarely fails on the spanner — on a chain written after recycling.

Secure ITAD laboratory where retired servers are tested and graded

The hall is the midpoint, not the end

Austrian halls are smaller than Frankfurt campuses; the documentation load is often higher: finance, administration, healthcare. A strip-out fails on access windows, mixed media streams and a file written three months later.

We inventory before the first rack, take media separately and write the chain in parallel. Neighbouring halls stay live. No phantom warehouse in Wiener Neudorf.

Server-room decommissioning is on-site work

A cage exit in Vienna, a room in Graz, a basement in Linz: strip-out, pack, remove, discretion. Free collection covers the lot, not only the carton at the dock.

The file — erasure certificate, chain, asset report, ESG summary — is written in parallel. Audit-ready, not back-filled.